|
Hello LTAP & TTAP,
To often our locals do not have an
oportunity for input in these national projects.
If you have electronic distribution
capabilities please consider forwarding this to your communities. Instructions
are included in the message below. Since it's that time of year, this
distribution should be included in your 2006 PAR.
Thank you for this
consideration,
GIb Peaslee
LTAP Program Coordinator This transmittal regards NCHRP Synthesis Topic 37-03, Management of
Selected Transporation Assets (i.e., assets other than pavements and
bridges). This synthesis of practice is being conducted for TRB and NCHRP
under the sponsorship of the American Association of State Highway and
Transportation Officials in cooperation with the Federal Highway Administration.
The objective of a Synthesis is to provide an overview of transportation
agencies' practices, recent literature findings, and research-in-progress
addressing the subject topic. Mr. Michael
Markow will be preparing the synthesis report under contract to TRB. A
number of U.S. and Canadian cities and counties are included in this
effort.
Following are guidelines TRB has prepared regarding the survey of agency practice for this study. For your convenience, the survey is being distributed as seven component questionnaires. Six of these address individual asset categories that are the major subjects of this study: traffic signals, roadway lighting, signs, pavement striping and markings, culverts, and sidewalks. Part 7 addresses broader asset management within an agency, and asks for information on interesting or unique management practices for other non-pavement, non-bridge assets. Please complete the attached questionnaires, or forward individual parts to the most appropriate persons in your agency. The instructions for completing the survey forms are appended to each of the parts. The questionnaires are electronic forms, and should be filled out on-line, saved, and emailed back to Mr. Markow. Also attached is a pdf file of all seven parts of this survey, for you to print if you wish. The report to be prepared from this information will serve as a resource to local governments, states, and provinces in their efforts to improve their methods and techniques of asset management. Your agency's response to the survey is extremely important to this study. Please note that the questions are mostly multiple-choice. Feel free, however, to include comments in the fields provided or in your email responses. Please have the completed questionnaires and any supporting materials returned to the contractor, Mr. Michael Markow, at the email address shown on the questionnaire by February 28, 2006. Once again, the questionnaire is provided in two formats: 1) As seven Microsoft Word electronic forms that can be filled out online,
saved, and emailed back, and If additional time or information is needed to complete the questionnaire, please contact Mr. Markow via email (mjmarkow@adelphia.net) or by phone at 508-540-5966, or Jon Williams of NCHRP at 202-334-3245. Thank you very much for your assistance. Michael J. Markow, P.E. 43 Rivers End Road Teaticket, MA 02536-5858 mjmarkow@adelphia.net Telephone (508) 540-5966 Cell Phone (508) 274-0988 |
survey NCHRP Synthesis 37-03 DISTR .pdf
survey PART-1 Signals NCHRP Synth 37-03 DISTR .doc
survey PART-2 Lighting NCHRP Synth 37-03 DISTR .doc
survey PART-3 Signs NCHRP Synth 37-03 DISTR .doc
survey PART-4 Markings NCHRP Synth 37-03 DISTR .doc
survey PART-5 Culverts NCHRP Synth 37-03 DISTR .doc
survey PART-6 Sidewalks NCHRP Synth 37-03 DISTR .doc
survey PART-7 Conclusion NCHRP Synth 37-03 DISTR .doc